Hydrolevel 1100 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Zubehör fürs Wasser Hydrolevel 1100 herunter. Hydrolevel 1100 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 4
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
83 Water Street New Haven, CT 06511 Phone (203) 776-0473 FAX (203) 773-1019 www.hydrolevel.com
ADVANCED SOLID STATE DESIGN
TEST BUTTON FOR EASY DIAGNOSTICS
POWER AND LOW WATER LED INDICATORS
MOLEX CONNECTOR FOR EASY WIRING
COMPACT SIZE ALLOWS FOR MOUNTING IN TIGHT SPACES
Step
Step
Step
Step
Low Water Cut-Off
For Residential
Hot Water Boilers
24 VAC Operating Voltage
Model 1100
Determine Mounting Location
The Safgard 1100 must be installed at or above the
minimum safe water level established by the boiler
manufacturer. The 1100 can be installed directly into
the boiler if a suitable tapping is available
. The
1100 can also be installed in the boiler piping using a
standard 3/4" tee
.
Note: When installing in piping, select a location
close to the boiler to ensure the 4' wiring harness will
reach the 24-Volt transformer. The cut-off should be
installed on the boiler side of the circulator or shut-off
valves.
IMPORTANT: Check for adequate clearance
(minimum 1/4") from metal probe sensor to any
surface inside the boiler or pipe.
Do not install in a location that could hold or trap
water in the event of a low water condition.
Apply Teflon
®
tape to
the threads of the
Model 1100. Do not
use pipe dope or
other pipe sealants.
Hand tighten the
control into boiler
tapping or pipe tee.
Be careful not to
cross thread.
Note: Do not use a
wrench. Hand tight-
en only.
Plug wire harness
into connector on
face of control.
WARNING
Electrical shock hazard. To prevent electrical shock, death or
equipment damage, disconnect power supply before
installing or servicing control. Only qualified personnel may install or service this control in
accordance with local codes and ordinances. Read instructions completely before proceeding.
CAUTION
To prevent serious
burns, boiler
should be thoroughly cooled before installing or
servicing control.
WARNING
Frozen pipes/water damage. Central heating systems are prone to shut down as a result of power or fuel outages,
safety related fault conditions or equipment failure. Installation of freeze protection monitoring or other precautions
is recommended for unattended dwellings in climates subject to sustain below-freezing temperatures.
Model 1100 Instructions: Model 1100 Instructions 4/30/12 10:24 AM Page 1
Seitenansicht 0
1 2 3 4

Inhaltsverzeichnis

Seite 1 - 24 VAC Operating Voltage

83 Water Street • New Haven, CT 06511 • Phone (203) 776-0473 • FAX (203) 773-1019 • www.hydrolevel.com•ADVANCED SOLID STATE DESIGN• TEST BUTTON FOR EA

Seite 2

WIRING TO CONTROL CENTERFor boilers equipped with a Honeywell R8285 Control Center or equivalentWIRING TO AN AQUASTATFor boilers equipped with a Honey

Seite 3 - WIRING TO 24 VAC TRANSFORMER

WIRING TO 24 VAC TRANSFORMERFor boilers using a standard 24 VAC transformerBOILER SPECIFIC MODELS AND WIRE HARNESSESConnect RED wire tohotside of 24 V

Seite 4 - SPECIFICATIONS

LIMITED MANUFACTURERʼS WARRANTYWe warrant products manufactured by Hydrolevel Company tobe free from defects in material and workmanship for a periodo

Kommentare zu diesen Handbüchern

Keine Kommentare